MBDC (Moratelindo Batam-Dumai Cable System)
MBDC (Moratelindo Batam-Dumai Cable System) is a high speed submarine cable system of 24 cores connecting Sumatra island (Dumai) to Batam island.
SYSTEM DESIGN :
A. Link Distance
- Total Length : 284.5 km
B. Customer
- PT. Mora Telematika Indonesia (Moratelindo) - 2009
BRPP (Back Up Route Panaran – Pemping)
SYSTEM DESIGN :
A. Link Distance
- Total Length : 24.5 km
B. Customer
- PT. PGAS Telekomunikasi Nusantara (2010)
Malang – Banyuwangi (Backbone)
System Design :
- Customer: Biznet
- Type Inland
- Start : Q-3 2014
- RFS : Q-1 2015
- Total Length of Cable : 357 KM
JIBACS (Jambi-Batam Cable system)
JIBA CS (Jambi Batam Cable System) is a high speed submarine cable system of 36 cores connecting Sumatra island (Kuala Tungkal) to Batam island (Tanjung Pinggir).
SYSTEM DESIGN :
A. BMH
- Kuala Tungkal, Jambi
- Tanjung Pinggir, Batam
B. Link Distance
- Submarine portion : 266.58 km
C. Cable Specs
- Submarine Cable (SA / DA) : ITU G.654.C
- Cores : 36 fiber